contractor_information
Rates and Fees
Certified Backflow   
Inspectors
Design & Construction   
Manual
Engineer CAD/DWG   
Specifications
contractor_contact
Default
contractors click here

Tariff Rates & Fees

NEW METER INSTALLATION FEES

As of January 2, 2001, all new service connections will be charge the following fees in accordance with Queen Creek Water Company's "Water Tariff Schedule", Decision NOS: 57211, 60737 & 62739 as approved by the Arizona Corporation Commission:


Meter SizeMeter Cost*Est FeeSec Dep**Hook-UpFire-Flow Total Fees
¾"$200$15$50$444$215$924
1"$250$15$50$740$215$1,270
1 ½"$450$15$50$1,480$215$2,210
2"$600$15$50$2,370$215$3,250
3"$950$15$50$4,440$215$5,645
4"$1,550$15$50$7,400$215$9,230
6"$3,725$15$50$14,800$215$18,805

*meter cost refundable @ 10% over 10 years
**security deposit refundable after 12 consecutive months of on time payments

IRRIGATION FEES:
MONTHLY USAGE CHARGE$3.00
CHARGE FOR OPENING / CLOSING VALVE$3.00*
COMMODITY CHARGE.50 PER 1,000 GALLONS/TYPE 2
.40 PER 1,000 GALLONS/ALL OTHER
VALVE INSTALLATION $50.00

* ONLY APPLIES TO CERTAIN SUBDIVISIONS

WHAT IS WATER MADE OF?

Atoms. An atom is the smallest particle of an element, like oxygen or hydrogen. Atoms join together to form molecules. A water molecule has three atoms: two hydrogen (H) atoms and one oxygen (o) atom. That is why water is sometimes referred to as H2O. One single drop of water contains billions of water molecules.
Contractor Information | How to Contact Us | Home | Site Map
Rates and Fees | Certified Backflow Inspectors | Design & Construction Manual | Engineer CAD/DWG Specifications
© 2005. Queen Creek Water Company. All Rights Reserved.  480-987-3240